Saturday, June 13, 2009

First Week of Framing Complete!

June 12, 2009...We drove over to the property Friday evening to document the progress from the first week of framing:

Second floor exterior walls are complete and housewrapped. The house looks very tall on the approach from the driveway, and there is a third floor going on the back half yet:

The great room has vaulted ceilings with exposed beams. The large space between the front windows looks a bit odd, I think, but that space was meant for the fireplace. I believe we've changed our plans yet again and will be purchasing a high-efficiency woodstove for this area. Seeing the interior dimensions for what they are, we've decided that the masonry stove will take up too much space, not only in the great room, but the footings and support column required in the basement eat up a lot of room, as well. We looked at a few Vermont Castings stoves this morning at a local retailer. With the tax rebates being offered this year, and eliminating the cost of the masonry required by the masonry stove, we should come out ahead.

Side view, great room on the left, kitchen on the right:

Back corner of the kitchen looking towards the front door:

Height of the great room is apparent here:

Sissy and I waving from the master bedroom window:

J-Bird and I at the front door, waiting for house guests. Steps leading up to the wrap-around deck will provide access to our front door (which is really cool, by the way...y'all just have to come over to see it for yourselves!)

This is the little corner on the right from the front door. Roof angle is apparent here:

Looking from the master bedroom towards the sliding door in the great room. I made a mistake here...didn't give Amish Ray the right dimensions for the slider, so they will need to redo it next week.

This is the wall separating the main floor bath from the master. There will be a door here:

View from the kitchen towards the great room:

Looking from the great room towards the master...the inset on the left is the front door:

The worksite is very clean...aside from a few drink bottles that were left behind. The men have stacked all the wood scraps in a pile, they have been sweeping the sawdust as they are working, and there is not a lot of other debris laying around. I had planned on taking the children over to do some clean-up, but it really hasn't been necessary.

This is a section of the parallam beam that runs through the garage providing support for the second floor. Using this type of beam eliminates the need for support posts in the garage, maximizing the usable space:

This engineered beam is extremely heavy...our crew of 2 men had to have help to lift it into place:

Cross-section of the beam...you can clearly see the smaller sections of wood that are glued and pressurized to make a very heavy, very strong piece of lumber:

We're off to do some sealing of the first floor concrete walls. Making our final decisions about siding and roofing colors. We have narrowed siding down to 2 colors...brick red or fern green. The guys in the family seem to like the green, and I do, too...I think it will help the house to "blend in" with the landscape, where the red would definitely be more "showy." We'll probably go with the green. To find out, you'll have to...

Stay tuned,
Kris

Thursday, June 11, 2009

Framing Day #4

June 11, 2009...We have 2nd floor walls! The wall with the 2 window openings is where the master bedroom will be:

From the back of the house, window on the right is master bedroom, small window in the middle is the main floor bath, window on the left is the country kitchen:

Looking westward:

Yesterday the excavator dug the holes for the porch/roof supports:

This corner/side of the second floor will house the country kitchen with an exterior door (the opening is still covered with housewrap) to access the garden side of the homesite:

Inside view looking towards the master bedroom:

The front wall of the great room is assembled...ready to lift into place and secure:

View from the front door towards the country kitchen:

Looking from the great room into the master bedroom:

Here's a special feature we added...lock-up room for unruly children (or guests?)...

Looking from the master towards the country kitchen:

Looking from the master towards the great room:

Looking (roughly) eastward towards the front corner:

I'll try to keep updating daily...hopefully tomorrow the second floor will be completed!

Stay tuned,
Kris

We're Floored!

June 10, 2009...It is the third day of framing, and I am really impressed with what has been accomplished so far. Floor joists and second floor sub-floor are installed:

We're getting a better sense of the interior dimensions now...no matter how many times we draw the rooms on graph paper, it's hard to visualize what the finished spaces will be like. The room to the right of the poles will be the younger boys' bedroom...I think we'll be getting them bunk beds to maximize their floor space. To the left of the poles on the left will be the utility/mechanicals/storage/laundry room. In between the poles will be the hallway and closets.

I've been looking forward to getting up to the second floor to check out the view, and, again, the room dimensions, and Amish Ray had some questions for us. I had moved a few walls to gain some storage space, but my unskilled technical drawing ability became apparent when he was transferring my measurements onto the subfloor. What looked feasible on paper didn't translate well in wood and nails. So, he suggested a solution, and it works for us.

Thinking about the positioning of a few windows and the exterior kitchen door.

He also had a question about my walk-in pantry closet. He couldn't fit our 30" door into the pantry with the dimensions I had drawn, so we decided to build one wall out a bit, actually giving me more storage...YEAH!

Here's Ray marking the subfloor for the interior walls:

Studying our plans...in a loosely Amish rendition of Rodin's "The Thinker":

The back side of the house looks rather monolithic...but it will be backfilled to within 18" of the second floor, so most of what you see here will be hidden.

What a VIEW!!!

The boys are having fun jumping from the inside of the house to the outside...

and, of course, CLIMBING!!!

Looking through the boys' window again...

Oh, look...it's Gramps - Oops! I mean Hubby - using the temporary staircase:

And here am I, showing a (really interested) J-Bird where the steps to the 3rd floor will be. (I think he's actually looking up imaging where his room is going.) Or maybe he's calling on Wisdom from Above to help us get through this whole process. Which is always a good idea.

That's it for today...more to come tomorrow, if possible.

Stay tuned,
Kris

Still Being Framed

June 9, 2009...Framing continues. Crew has installed posts (not visible in this photo) to support 2nd floor, floor joists (the boards running horizontally in this photo.) Ray is living dangerously once again...acting like he's done this a time or two before:

There he goes again:

Hubby took this photo to show the huge beam that runs through the garage. It is actually 2, 4" thick engineered beams laminated together...and, boy, is it heavy! The 2-man crew had some help to get it up there.

Looking through the boys' window opening...2, 36"x60" windows will eventually fill this space:

The lumber is laid out and ready to grab as needed:

Another shot from the driveway:

Stay tuned,
Kris