Saturday, July 4, 2009

Framing Week #4 (Lots of pictures!)

Monday, June 29, 2009...Work continues on the third floor rafters. Daniel (on the right) and his helper (left) are installing the roof overhang supports. I don't know how they work up there...not only it it 3 stories high, but the driveway is so steep that it makes it feel more like 5.

Daniel at the peak. The weather was beautiful...as was the view, I'm sure.

Ray out back working on the third floor bath bump-out:

Continuing on the overhang supports:

Perhaps Daniel had too much roof work for now...they've traded places:

Sheathing begins on the front side of the third floor...Ray and Daniel combine strength and agility 3 stories high...not for the faint of heart!

Hubby took this week off to get started on a few of our projects. First up...constructing the box that will support the outdoor furnace. We used some of the treated lumber that was on site...hope they don't miss it!

My dad was on hand this week as well...to help out where needed and to evaluate the plumbing situation. He thinks we have a few challenges ahead...has that ever stopped us before?

Once the box was constructed, we prepared the location and set it in place. We prepared the box to accommodate corrugated conduit, which will carry the PEX tubing that carries the heated water into the house. But we realized our measurements were a bit off, so the conduit was removed and will hook into the furnace from outside the box. Here hubby is bringing in a load of 2B stone:

The box is filled, and we're placing deck blocks in the corners to support the furnace legs. Leveling the blocks is crucial...we don't want the furnace tumbling down the hill.

Ahhhh...a thing of beauty. You don't think so? Well, if you'd worked as hard as we did putting this thing in place...you WOULD think so, I'm sure.

Tuesday, June 30, 2009...Rained a lot this morning. No work at the homesite.

Wednesday, July 1, 2009...Of all the days to forget the camera...this was NOT the one. Perhaps the most excitement so far took place today...and we didn't capture it. Moving the furnace into place proved to be a huge challenge. Ray thought he could lift it into place with the Skytrak...but the combination of incline and soggy ground from the day before prevented us from completing the job. He got stuck...Hubby had to pull him out with the Magnatrac...he nearly tipped his machine over...and ended up setting the furnace down rather rapidly (though skillfully) so this is where it ended up...it's propped up and tied to a tree for now...waiting for our excavator to try his machinery next week:

Thursday, July 2, 2009...After that excitement...we were ready to attempt something a little less stressful...backfilling inside the footers. Hubby purchased this steel ramp at university salvage a year or so ago, and it really came in handy for this job.

Hubby was cautious entering and exiting the garage...there were only a few inches to spare:


The ramp allowed Hubby to bring the stones right into the basement and dump them where needed...A LOT faster than using the wheelbarrow!

As always, J-Bird jumps right in to lend a hand. He is learning to find satisfaction in hard work, and for that, we are thankful.

Hubby on his way in with another load:

Hubby maneuvered around the many obstacles with ease:

Looking from the ground floor bathroom towards the garage area...you can see the clearances are pretty tight:

J-Bird working at breaking up several chunks of excess concrete, poured out onto the ground (and basically wasted) after the footers were completed. We should've thought ahead to build some forms to capture any extra material...we paid for it...now it'll just become expensive fill.

I-Bird perched in his future bedroom window...watching his brother?

Meanwhile, the building crew is installing rafters in the great room. The rafters are cut from 2" x 12" x 22' boards...they extend from the peak of the roof out over the porch. They cut one rafter to use as a pattern and used that pattern to mark all the others. The pattern piece was the last one to be nailed in place.

Another view of the great room rafters...looks like a giant ribcage:

This is looking from the far end of the great room towards the center hall. You can see the roof line (with the black felt paper adhered) extending down into the great room. We think there will be a section of vertical wall built and installed here (so the angled roof section will be hidden).

The peak of the roof overhang on the deck. Someone...some time...will have to get up there and stain that treated roof support beam. Any volunteers?

This is the view roughly westward out of my future kitchen door. There will be a small landing here and steps down to the yard on this side of the house. The garden will be on the other side of the rock piles in the foreground.

We decided not to spend money on a dumpster. We've been sorting and stacking the scrap wood...there's quite a lot leftover so far. The boys will have lots of project fodder! We're bagging the unusable trash and will dispose of it at the local dump.

Panoramic view. The felt paper is adhered to the third floor roof, and bathroom bump-out is sheathed and ready for finishing.

We finished installing rigid foam to the back wall, but still have the sides to do. We removed 2 bracing boards to use for leveling the wood furnace, and those foam panels came loose. We're not sure what happened, but the rest of the foam seems to be sufficiently adhered.

Looking up towards great room...front porch posts and roof supports are in place...it is HIGH up there!

One day soon there will be a different vehicle parked in the garage...and we'll be able to call this place HOME. We can't wait!

Friday, June 26, 2009

Framing Week #3

June 22, 2009 - June 26, 2009...The third week of framing has come to a close, and what do we have here? Rafters, perhaps?

Ahhhhhh...rafters, indeed! Third floor bedrooms are beginning to take shape!

And, look...a small forest imp peeking up over the floor:

Looking from one end of the third floor towards the other:

View of third floor from the deck...(there's that imp again...)

Roof support posts are in place around the perimeter of the deck:

Driveway view of home...third floor rafters in progress...porch roof support posts in place:

Driveway view again...there will be a large window in each end of the third floor, a skylight in each bedroom, and a skylight in the roof above the hall.

The photos really make the house look huge...several people have told us...but, in reality, it's only about 2,000 finished square feet. Including the garage and unfinished utility/mechanicals room, it's probably closer to 2,600 total square footage. I think the setting...plus the approach to the home from below exaggerate the actual size.

We're down to the wire for choosing shingles and siding. Hubby is getting another estimate from an out-of-town supplier, then we'll have to make our final decisions. It looks like we'll be working next week on several projects...Hubby took vacation, and we have some help lined up. We are anxious to get busy and do our part to make this dream a reality!

Hope to see you soon!

Stay tuned,
Kris

Framing Week #2

June 15, 2009 to June 19, 2009...Framing continues. Work begins on the deck...very exciting for us!

The great room is surrounded by deck on all three sides, with a roof overhead...so we should be able to enjoy this outdoor space 8-9 months of the year. The children are excited about sitting outside to do their schoolwork. I'm anticipating evening meals watching the sunset over the mountains. We've never had a large outdoor space like this, and it's one of the things we are most looking forward to about living in this house.

Our original plan was to have the crew build columns to support the deck and roof. Somehow that bit of information got lost in translation, and treated, 6"x6" posts were ordered instead. I was a little upset, at first...thinking they would look "puny" in comparison to the size of the deck. Now that they're installed (and I have no choice, really...HaHa!), I'm fine with the look.

Looking out the garage door on the far side of the house:

Evidence of the heavy rains we had this week. Building permit hanging on the post to the far right:

View from the kitchen window onto the deck:

Looking back the hallway from the great room towards the main floor bath:

Kitchen pantry closet. I rearranged the entire kitchen layout so that I could find a place for this. If you remember from an earlier post, it was one of my 3 "must-haves"...1)pantry closet... 2)wide windowsills... 3)fireplace. The fireplace has been reduced to a woodstove, wide windowsills are still in the works (I hope!), and pantry closet is now a reality. (YEAH!!!) In our last house, my pantry was about 30" wide...nowhere near large enough to accommodate a family our size. I buy many things in bulk, and having a convenient place to store and access my ingredients will be a daily blessing.

Standing on the third floor looking towards the great room. Once the walls are in place, this view will be gone:

Looking down from the third floor, through the second floor, into the first (ground) floor. We'll be thankful when the rough steps are in place!

View from the third floor towards the great room. You can see the puddle of water on the subfloor from this week's rain:

View from one of the third floor bedrooms, looking down the drive. We're giving J-Bird his choice of upstairs bedrooms. My aunt and uncle blessed him with the beautiful bedroom furniture that belonged to my cousin, so he'll have a wonderful space to work and study (when he's not on the porch!) He wants to wait until the walls are up to make his decision.

Thanks for stopping by...please leave a comment if you haven't already...and...

Stay tuned,
Kris